Tel:+86 010-80481116 Email:contact@nexson-group.cn
thermowave — Brand of Nexson Group
Home / Media Center

Media Center

Company news, technical articles and exhibitions

University–Industry Exchange | Peking University Energy and Resources Engineering Students Visit Nexson Beijing Factory

From a single stainless steel plate to a finished unit leaving the shop floor: students and faculty from the Department of Energy and Resources Engineering at Peking University walked the full route at Nexson’s Beijing plant — stamping, assembly, welding — and watched the heat transfer equations from their lectures land on real workstations.

2026-10-23

Nexson Supports the CCUS Project Attached to PetroChina’s Ethylene Plant, Building a New Low-Carbon Model

The plate-and-shell heat exchangers custom designed and built by Nexson Group for the CCUS project attached to PetroChina Dushanzi Petrochemical’s Tarim 1.2 Mt/a Phase II ethylene plant have passed the owner’s stringent acceptance tests, with all batches delivered — a landmark CCUS reference now in place for Nexson Group.

2026-09-30

20,000-Ton Hydraulic Press Enters Service | Continued Investment Lifts Core Manufacturing Capability at Nexson Beijing

On 21 September 2026, the automated heat exchanger plate stamping line at Nexson’s Beijing factory went into official operation, with a new 20,000-ton press entering service at the same time — a milestone for the company in core component manufacturing. Plate stamping, welding and inspection are now automated end to end.

2026-09-23

Precision Temperature Control on Battery Lines — CALB and Leapmotor Jointly Validate Nexson’s ThermoSkid Solution

The capacity race in traction and storage batteries is still accelerating in 2026. CALB has broken ground on a 51 GWh traction and storage battery base in Xinyang, Henan, with total investment of RMB 9.63 billion; Zhongling New Energy, its joint venture with Leapmotor, is building a 33.6 GWh intelligent battery manufacturing base in Wuyi, Zhejiang.

2026-08-14

Pushing the Boundaries of Industrial Innovation — Nexson Group Delivers 22 Custom Super Duplex Spiral Plate Heat Exchangers

Nexson Group has completed delivery of 22 custom-built super duplex spiral plate heat exchangers. Designed for the demanding duties of phosphate rock mining and phosphate chemicals, they handle the complex heat transfer and corrosive media of the industry, reflecting the company’s capability in custom design and manufacturing of industrial heat exchange equipment.

2026-07-03

A New Address, A New Chapter | The Nexson Shanghai Office Is Officially Open

The Nexson Shanghai office is now officially open. Group founder and CEO Charles Bonnafous, Asia-Pacific General Manager Fang Minhua, and Lin Zihua, Senior Operations Director of the Beijing factory, were all present to witness the upgrade of the company’s service presence in east China.

2026-06-17

Nexson Group France, Nexson Beijing and Shaanxi Zhituo Enter a Global Strategic Partnership

Nexson Group France (“Nexson”) and Nexson (Beijing) Industrial Technology Co., Ltd. have formally signed a global strategic cooperation agreement with Shaanxi Zhituo Solid Phase Additive Manufacturing Technology Co., Ltd. (“Shaanxi Zhituo”) on printed circuit heat exchangers (PCHE), marking the start of deep global cooperation between the two sides around their respective core strengths.

2026-06-15

Huairou District Party Secretary Zhang Qiang Meets with Nexson Group France Founder and CEO Charles Bonnafous

On 9 June, Zhang Qiang, Secretary of the Huairou District Party Committee and Secretary of the Party Working Committee of Huairou Science City, met with Charles Bonnafous, founder and CEO of Nexson Group France. The two sides held in-depth exchanges on leveraging the strategic resource concentration of the Huairou Comprehensive National Science Centre, deepening cooperation in high-end equipment manufacturing, and promoting the high-quality development of foreign-invested enterprises.

2026-06-10

Nexson at the 2026 National Forum on High-Quality Development of Refrigeration and Cold Storage

From 3 to 5 June in Liyang, Jiangsu — the 2026 National Forum on High-Quality Development of Refrigeration and Cold Storage was held under the theme “Digital intelligence empowering, moving forward with innovation”. It examined core topics including cold chain food, energy saving and carbon reduction in refrigeration systems, equipment reliability and whole-life-cycle cost, drawing design institutes, engineering companies, end users and core equipment suppliers together.

2026-06-09

Nexson Group France at China Refrigeration Expo 2026 — A Successful Close

On 10 April, the 2026 China Refrigeration Expo, the industry’s premier global event, closed at the Beijing Capital International Exhibition Center. Bringing together over a thousand companies and tens of thousands of industry professionals, it served as the core platform for technical exchange and business matchmaking in refrigeration.

2026-04-14

Three Years of Deep Roots, Capital Behind Us | Nexson (Beijing) Marks Its Third Anniversary and Receives Strategic Investment from Beijing Guoguan Shunxi Fund

On 28 February 2026, Nexson (Beijing) Industrial Technology Co., Ltd. marked its third anniversary and formally received strategic investment from the Beijing Guoguan Shunxi Fund. The investment adds national-level capital backing to the company’s technology innovation, capacity upgrading and global layout, and will further accelerate its growth in the high-efficiency heat exchanger industry across China and Asia-Pacific.

2026-02-28

Nexson Group Again Delivers a Customised Heat Exchanger Solution for an FPSO Customer

As global offshore oil and gas development pushes into deeper and more distant waters, the FPSO (floating production storage and offloading unit) as core equipment places extreme demands on corrosion resistance, space adaptation and operating stability of its supporting equipment. Nexson Group has secured another important breakthrough, successfully delivering a batch of customised heat exchangers for a large FPSO project.

2026-01-23
1 2 →
Have a heat transfer challenge? Let our engineers handle it
Tell us your media, temperature, pressure and space constraints — get a selection proposal within 48 hours.
Get a Quote
Get a Quote