In Ningbo Petrochemical Economic and Technological Development Zone, a provincial key foreign-invested chemical project in Zhejiang with first-phase investment of RMB 5.6 billion using INEOS Styrolution's proven Terluran ABS process; output serves automotive parts, appliance housings and consumer electronics shells — INEOS's first large-scale ABS base in China. Also a 400kt/a POCHP propylene oxide project in Yantai Wanhua industrial park (RMB 2.481 billion) using Wanhua's own green direct oxidation process.
Part of the BASF Zhanjiang Verbund site (BASF's largest single overseas investment, about EUR 10 billion planned), producing acrylic acid and butyl acrylate for water-based coatings, construction adhesives and superabsorbent polymers, with a low-carbon power supply that cuts emissions significantly versus conventional petrochemical sites.
The citral plant at the Zhanjiang Verbund is a key node of BASF's flavors and fragrances chain; citral is a necessary intermediate for synthetic menthol, high-end daily-care fragrances and vitamins. Built on BASF's own precision synthesis process, it breaks overseas capacity dominance in high-end aroma ingredients. Also a process upgrade on an existing 400kt/a PVC line, expanding VCM capacity from 400 to 480kt/a and adding polymerisers and centrifuges.
Huizhou ethylene phase I, a provincial key petrochemical project with total investment of about RMB 34.8 billion: a 500kt/a LLDPE unit and two 450kt/a PP units designed by SEI, producing polyethylene and polypropylene for South China packaging and plastics. Plus an SPVC heat exchange upgrade on the existing PVC line to improve stability and cut steam consumption.
Wanhua Penglai high-performance new materials integrated project, POCHP propylene oxide section using Wanhua's own green oxidation process with about RMB 2.2 billion invested; the propylene oxide feeds polyurethane production and expands polyurethane raw material capacity in eastern Shandong.
Jointly invested by Sinopec and INVISTA in Tianjin Nangang with investment of RMB 3.86 billion; the ABS line uses self-produced styrene from the ethylene project and supplies automotive parts and appliance housings.
Invested by Metorex Ruashi Mining and built by Jinchuan Group Engineering with total investment over USD 1.3 billion: hydrometallurgical refining of copper-cobalt ore producing electrolytic copper and battery-grade cobalt for the power battery upstream material chain.
New 250kt/a butyl-octanol unit at Anqing Shuguang Butyl-Octanol Chemical, EPC by Sinopec Shanghai Engineering, investment RMB 2.14 billion; products serve as PVC plasticisers and industrial coating solvents. Also phase II of the Fujian 800kt/a PVC project (RMB 2.31 billion) adding 400kt/a ethylene-route PVC for Southeast coastal building materials and rigid pipe markets.
Overseas propane dehydrogenation complex with 570kt/a PDH and 570kt/a PP units, total investment about USD 920 million, producing polypropylene. Also a hydrogen cyanide unit at the Penglai integrated project (RMB 870 million): high-purity hydrofluoric acid is essential for semiconductor wafer etching, extending Wanhua's fine chemicals portfolio.
PEM water electrolysis hydrogen production platform where plate heat exchangers handle pure water temperature control for green hydrogen production, suited to PV-coupled hydrogen production and hydrogen station storage temperature control. Also new plate exchangers and a circulating water cooler retrofit on the East China Sea Xihu oilfield Zhenzhu platform.
Kerosene/crude oil heat exchange duty at NOVATEK's Russian oil and gas site, recovering waste heat from the medium to cut fuel consumption and improve energy efficiency in crude pre-treatment.
Propane heater at the plant's propane receiving station, warming low-temperature propane before dehydrogenation to keep feed conditions stable.
Jintang new materials project adding 1.2 Mt/a ABS capacity including a 600kt/a emulsion-process ABS line, for automotive plastic parts and appliance housings.
Circulating water cooler for the booster compressor module on the Dongfang 13-2 CEPB offshore platform, providing temperature control for the compressor train and stable booster export at the South China Sea deepwater gas field.
Sulfuric acid coolers added to the sulfuric acid line to control outlet temperature of hot acid, avoid corrosion risk and keep the plant running safely and continuously.
Relocation and upgrade of the pilot plant at Wanhua Yantai industrial park, rebuilding the polyether/polyester pilot line to support trial production and formulation verification of new polyurethane materials.
Sulfuric acid coolers and lube oil coolers on the sulfuric acid line, controlling the temperature of product acid and unit lube oil to keep both the main line and power equipment running stably.
Reboiler heat exchange parts for the crude distillation unit (CDU), providing stable heat for crude fractionation and improving separation efficiency in atmospheric distillation.
Ammonia/calcium chloride heat exchange equipment added to the chemical line for salt solution temperature control, keeping parameters on target in salting-out and feed pre-treatment.
Developed by Sinopec with Russia's Sibur, one of the world's largest polymer complexes, including a 400kt/a polypropylene unit built by SEI; output supplies general-purpose plastics to the Northeast Asian rubber and plastics market.
Retrofit recovering vent gas on the CEPI platform and the Century floating facility, with heat exchange parts recovering waste heat from tail gas and cutting direct venting losses. Also heat exchange for a PVC resin line at a plastics plant (EPC by CTCI), stabilising polymerisation temperature and improving PVC product quality.
New electrolytic fluorine production line where plate heat exchangers control electrolyser temperature, avoiding overheating of highly corrosive media and ensuring stable output of high-purity electronic-grade fluorine gas.
For a 16,000 m³ LNG deep-cold reliquefaction unit the heat exchanger serves as a nitrogen cooler, cooling recirculating refrigeration nitrogen to keep LNG storage cold and improve boil-off gas recovery.
Genting's floating LNG project, EPC by Wison Clean Energy, with gas pre-treatment and liquefaction facilities; plate heat exchangers serve feed gas pre-cooling and waste heat recovery under harsh offshore floating LNG conditions.